2011-12-14MAX completes Phase II drill program Majuba Hill copper/silver project in Nevada; additional soil sampling completed at newly discovered DeSoto zone2011-10-31MAX commences Phase II drill program at Majuba Hill copper/silver project in Nevada to follow up on recent high-grade drill results2011-10-26News Release2011-10-25MAX drills 44.2 m of 71.0 g/t Silver and 1.14% Copper at Majuba Hill, Nevada2011-10-12MAX drills 13.7 m of 30 g/t (0.96 oz/t) silver and 0.47% copper in fourth hole at Majuba Hill, Nevada; additional assay results pending2011-09-27MAX drills 42.7 m of 37.5 g/t (1.21 oz/t) Ag and 0.38% Cu at Majuba Hill; includes 10.7 m of 90.2 g/t (2.90 oz/t) Ag and 0.93% Cu2011-09-15MAX samples up to 1.53% Cu and 209 g/t Ag in soils at Majuba copper/silver project in Nevada; permitting underway for additional drilling2011-08-17MAX Grants 1,625,000 Incentive Stock Options2011-08-08MAX completes soil sampling and additional drilling at Majuba Hill copper/silver project in Nevada2011-06-09MAX commences drill program at Majuba Hill copper/silver project in Nevada2011-05-31MAX drills 9.6 metres of 1.04 g/t Au at Table Top in Nevada, extends strike of mineralization by 244 metres2011-04-12MAX completes six core drill holes at Table Top gold project in Nevada; drilling to begin at Majuba Hill copper/silver project in April.2011-04-11MAX Completes Private Placement for $564,6912011-03-30MAX begins exploration at historic Majuba Hill Copper/Gold/Silver Property in Nevada; excavation underway for April drill program2011-03-17MAX resumes drilling at Table Top gold project in Nevada, immediately south of the Newmont/Fronteer Sandman gold project2011-03-07MAX agrees to Private Placement for $560,0002011-03-04MAX acquires interest in Majuba Hill Copper/Gold/Silver Property in Nevada; exploration to focus on high-grade silver and copper potential2011-02-17MAX to resume drilling at Table Top gold project in Nevada, immediately south of Fronteer Gold's Sandman gold property. Sandman is one of three Nevada properties being acquired by Newmont Mining Corp.2011-01-18MAX extends mineralized drill interval to 12.1 m of 0.91 g/t Au at Table Top, Nevada