Max Resource Corp.
NewsNews Releases


Cautionary Note to U.S. Investors
The United States Securities and Exchange Commission limits disclosure for U.S. reporting purposes to mineral deposits that a company can economically and legally extract or produce. We use certain terms on this web site, such as "reserves", "resources", "geologic resources", "proven", "probable", "measured", "indicated" or "inferred", which may not be consistent with the reserved definitions established by the SEC. U.S. investors are urged to consider closely the disclosure in our Form 20-F, File No. 000-30780. You can review and obtain copies of these filings from the SEC's website at http://www.sec.gov/edgar.shtml.

News Releases are added to our web site immediately upon release to the general public. If you would like to receive news releases via e-mail or fax, please fill out our Request More Information form.

Previous. All pages. Next. Page 1. 2. 3. 4. 5. 6

December 14, 2011  MAX completes Phase II drill program Majuba Hill copper/silver project in Nevada; additional soil sampling completed at newly discovered DeSoto zone
October 31, 2011  MAX commences Phase II drill program at Majuba Hill copper/silver project in Nevada to follow up on recent high-grade drill results
October 26, 2011  News Release
October 25, 2011  MAX drills 44.2 m of 71.0 g/t Silver and 1.14% Copper at Majuba Hill, Nevada
October 12, 2011  MAX drills 13.7 m of 30 g/t (0.96 oz/t) silver and 0.47% copper in fourth hole at Majuba Hill, Nevada; additional assay results pending
September 27, 2011  MAX drills 42.7 m of 37.5 g/t (1.21 oz/t) Ag and 0.38% Cu at Majuba Hill; includes 10.7 m of 90.2 g/t (2.90 oz/t) Ag and 0.93% Cu
September 15, 2011  MAX samples up to 1.53% Cu and 209 g/t Ag in soils at Majuba copper/silver project in Nevada; permitting underway for additional drilling
August 17, 2011  MAX Grants 1,625,000 Incentive Stock Options
August 08, 2011  MAX completes soil sampling and additional drilling at Majuba Hill copper/silver project in Nevada
June 09, 2011  MAX commences drill program at Majuba Hill copper/silver project in Nevada
May 31, 2011  MAX drills 9.6 metres of 1.04 g/t Au at Table Top in Nevada, extends strike of mineralization by 244 metres
April 12, 2011  MAX completes six core drill holes at Table Top gold project in Nevada; drilling to begin at Majuba Hill copper/silver project in April.
April 11, 2011  MAX Completes Private Placement for $564,691
March 30, 2011  MAX begins exploration at historic Majuba Hill Copper/Gold/Silver Property in Nevada; excavation underway for April drill program
March 17, 2011  MAX resumes drilling at Table Top gold project in Nevada, immediately south of the Newmont/Fronteer Sandman gold project
March 07, 2011  MAX agrees to Private Placement for $560,000
March 04, 2011  MAX acquires interest in Majuba Hill Copper/Gold/Silver Property in Nevada; exploration to focus on high-grade silver and copper potential
February 17, 2011  MAX to resume drilling at Table Top gold project in Nevada, immediately south of Fronteer Gold's Sandman gold property. Sandman is one of three Nevada properties being acquired by Newmont Mining Corp.
January 18, 2011  MAX extends mineralized drill interval to 12.1 m of 0.91 g/t Au at Table Top, Nevada
December 16, 2010  MAX drills 9.1 metres of 1.092 g/t gold at Table Top in Nevada; additional assays pending.

Previous. All pages. Next. Page 1. 2. 3. 4. 5. 6

 
Max Resource Corp.Max Resource Corp.
Max Resource Corp.Max Resource Corp.Max Resource Corp.